(U) Range Standardization and Automation (RSA) Phase 2A/B

-Description
-Initiatives
-Links
-Impacts
-Requirements
-Lead
-Programmatics
-Categories
-POC
-Images
-Road Map
-Text Version

Overview (U):

(U) The Range Standardization and Automation (RSA) program will completely overhaul and modernize both the Eastern Range at Patrick AFB, FL, and the Western Range at Vandenberg AFB, CA, treating both as a single integrated range system. RSA, divided into two phases, will develop the integrated range system using remote control and automation techniques to reduce the number of required operators, sites and facilities, and improve responsiveness.


Description (U):

(U) Two national ranges, the Eastern Range and Western Range provide tracking, telemetry, communications, command/control and other support capabilities necessary to safely conduct civil, commercial and national security spacelift operations, ballistic missile test and evaluation (T&E), and a variety of aeronautical and guided weapons T&E.

(U) Current range assets are based on 1950's and 1960's designs and technology, and are arrayed in a highly inefficient, manpower intensive architecture. Range instrumentation reliability is deteriorating and over 40% of the components are obsolete without sources of support. The ranges currently do not provide the responsiveness and flexibility critical to affordably support the nation's space lift needs.

(U) The FY 1996 RSA Phase 2A contract was competitively awarded to provide design and integration of the complete range architecture and also procure a Western Range Operations Control Center; imaging systems; communications systems; mobile metric, telemetry and command assets; surveillance systems; weather data collection and prediction systems; debris tracking systems; planning and scheduling systems and data processing/display systems. A FY 2003 follow-on equipment contract will provide the primary telemetry receiving, metric tracking and command systems.

User Impact (U):

(U) RSA is critical to the future of spacelift ranges. Performance and cost goals cannot be achieved without RSA. The result will be a reconfigurated range system capable of a major operation in less than 4 hours versus 2-3 days. An objective of RSA is to operate for 20% less than current range costs but is supportable through existing Air Force logistics infrastructure and standard practices.

Programmatics (U):

(U) Programmable.

Images (U):

(U) None.

Related Initiatives (U):
NameTitle
COMMUCommunications Upgrades (COMMU)
Eastern RangeEastern Range
Network Operations UpgradesNetwork Operations Upgrades (NOU)
Range UpgradesRange Upgrades (RANGEU)
RSA Phase 1Range Standardization and Automation (RSA) Phase 1
Western RangeWestern Range
This Table Is Unclassified.

Related Requirements (U): None.

Related Categories (U):
NameTitle
Range Standardization & Auto.Range Standardization and Automation Program (RSA)
SpaceliftSpacelift
This Table Is Unclassified.

Road Map Placements (U):

NameTitle
National Security Space Road MapIntegrated System Road Map
SPACE FORCES SUPPORTSPACE FORCES SUPPORT
This Table Is Unclassified.

Requirements, Funding and Additional Hotlinks (U):

(U) None.

Lead Office (U):

Air Force.

(U) DoD: USD(A&T) and OASD(C3I), Pentagon, Washington, DC
(U) Service Staff: SAF/AQS, Pentagon, Washington, DC
(U) Major Command: HQ AFSPC/DR, Peterson AFB, CO
(U) Program Management: SMC/CW, Los Angeles AFB, CA

Point of Contact (U):

(U) Lt Col David Hills, SMC, Open Phone: None..

Date Of Information (U):

(U) 17 June 1998



HOME USER GUIDE INDEX

(U) For comments/suggestions contact: Office of the National Security Space Architect (NSSA), 571-432-1300.

(U) Road Map Production Date: 23 June 2001


The effects of any budget/program decisions made since the information was collected during 1997-98 are NOT reflected in the National Security Space Road Map (NSSRM).