The effects of any budget/program decisions made since the information was collected during 1997-98 are NOT reflected in the National Security Space Road Map (NSSRM).
NSSA Logo

(Click on boxes below for more information)

[SPACE CONTROL: NMD/ COUNTERSPACE]

This Figure Is Unclassified.


The effects of any budget/program decisions made since the information was collected during 1997-98 are NOT reflected in the National Security Space Road Map (NSSRM).


Initiatives on the SPACE CONTROL: NMD/ COUNTERSPACE Road Map (U):

NameTitle
Active On-Board ProtectionActive On-Board Protection
Army Kinetic Energy Kill VehicleArmy Kinetic Energy Kill Vehicle
ARROWIsraeli Cooperative Project (Arrow)
Ground-Based Interceptor (GBI)Ground-Based Interceptor (GBI)
Ground-Based Laser Beam ControlGround-Based Laser Beam Control Technology
Ground-Based Laser JammerGround-Based Laser Jammer
Ground-Based Radar PrototypeGround-Based Radar Prototype
HAWK Air Defense SystemHAWK Air Defense System
JTMD BM/C3IJoint Theater Missile Defense (TMD) Battle Management/Command, Control, Communications and Intelligence (JTMD BM/C3I)
JTMD M&SJoint Theater Missile Defense (TMD) Modeling and Simulation
JTMD MODSJoint Theater Missile Defense (TMD) Existing Systems Modifications (JTMD MODS)
JTMD T&EJoint Theater Missile Defense (TMD) Test and Evaluation (T&E) (JTMD T&E)
LEO Hard Kill ASATLow Earth Orbit (LEO) Hard Kill ASAT
MEADSMedium Extended Air Defense System (MEADS)
N/UWSSNORAD/USSPACECOM Warfighting Support System (N/UWSS)
Navy Area DefenseNavy Area Defense
Navy Theater-Wide TBMDNavy Theater Wide Theater Ballistic Missile Defense System (TBMD)
NMD BMC3 PrototypeNational Missile Defense Battle Management Command, Control, and Communications (NMD BMC3) Prototype
NMD X-Band RadarNational Missile Defense X-Band Radar
PAC-3Patriot Advanced Capability-3 (PAC-3)
SBIRS-LowSpace-Based Infrared System - Low Earth Orbit (SBIRS-Low)
Small RF VehicleSmall RF Vehicle
SP-Based Relocatable RF JammerSpace-Based Relocatable RF Jammer
Space-Based LaserSpace-Based Laser (SBL)
STW&ARSSatellite Threat Warning and Attack Reporting System (STW&ARS)
THAADTheater High Altitude Air Defense (THAAD) System
UAV BPIUnmanned Aerial Vehicle (UAV) Boost Phase Intercept (BPI)
UEWRUpgraded Early Warning Radars
This Table Is Unclassified.

Requirements, Funding and Additional Hotlinks (U):

Name
Defense Budget-2000
National Security Space Road Map
FY 2000/2001 Air Force Budget
NSSRM and SPACE.xxx News Page
SAF/AQ Homepage
This Table Is Unclassified.

Last Road Map Update (U):

(U) 23 June 2001




HOME USER GUIDE INDEX

(U) For comments/suggestions contact: Office of the National Security Space Architect (NSSA), 571-432-1300.

(U) Road Map Production Date: 18 June 2001


The effects of any budget/program decisions made since the information was collected during 1997-98 are NOT reflected in the National Security Space Road Map (NSSRM).
Space Based Missile Defense Negation Surveillance Ballistic Missile Defense Ground Based Missile Defense Protection Command and Control (C2) and Data Handling Joint TMD Program Efforts (U) Programmed.
	(U) IOC: 10/2000 (1QFY2001).

(U) Organizations and Funding:
	(U) USSPACECOM: Funding Source.
	(U) NORAD. (U) Programmed.
	(U) IOC: 10/1998 (1QFY1999). (U) Concept/Technology.
	(U) IOC: 01/2018 (2QFY2018).
	(U) FOC: 01/2020 (2QFY2020).

(U) Organizations and Funding:
	(U) AFMC: Funding Source.
	(U) BMDO. (U) Programmed.
	(U) IOC: 10/2003 (1QFY2004). (U) Programmable.
	(U) IOC: 09/2003 (4QFY2003). (U) Programmed.
	(U) Decision Point: 11/1999 (1QFY2000).
	(U) IOC: 10/2003 (1QFY2004). (U) Programmed.
	(U) IOC: 01/2007 (2QFY2007).

(U) Organizations and Funding:
	(U) Army: Funding Source. (U) Programmed.
	(U) IOC: 01/2007 (2QFY2007). (U) Programmed.
	(U) Decision Point: 02/1998 (2QFY1998).
	(U) IOC: 01/2003 (2QFY2003). (U) Programmed.
	(U) IOC: 10/2001 (1QFY2002).

(U) Organizations and Funding:
	(U) BMDO.
	(U) Navy: Funding Source. (U) Programmed.
	(U) IOC: 01/2000 (2QFY2000). (U) Programmed.
	(U) IOC: 01/1998 (2QFY1998). (U) Programmed.
	(U) IOC: 10/1999 (1QFY2000). (U) Operational.
	(U) Programmed.
	(U) Decision Point: 01/1998 (2QFY1998).
	(U) IOC: 01/2005 (2QFY2005). (U) Operational.
	(U) IOC: 10/1996 (1QFY1997). (U) Operational.
	(U) IOC: 10/1996 (1QFY1997). (U) Programmable.
	(U) IOC: 10/2001 (1QFY2002). (U) Programmable.
	(U) IOC: 10/2004 (1QFY2005).
	(U) FOC: 10/2008 (1QFY2009).

(U) Organizations and Funding:
	(U) Air Force: Funding Source. (U) Concept/Technology.
	(U) IOC: 10/2020 (1QFY2021).

(U) Organizations and Funding:
	(U) Air Force: Funding Source. (U) Programmable.
	(U) IOC: 10/2006 (1QFY2007). (U) Programmable.
	(U) IOC: 10/2003 (1QFY2004). (U) Programmable.
	(U) IOC: 01/2005 (2QFY2005). (U) Programmable.
	(U) IOC: 01/2005 (2QFY2005). (U) Programmable.
	(U) IOC: 01/2007 (2QFY2007). (U) Concept/Technology.
	(U) IOC: 02/1996 (2QFY1996). (U) Operational.
	(U) IOC: 07/1998 (4QFY1998). (U) Programmed.
	(U) ATP: 09/2002 (4QFY2002).
	(U) IOC: 09/2006 (4QFY2006).

(U) Organizations and Funding:
	(U) AFSPC: Funding Source.
	(U) SAF/AQ: Funding Source.